First, a very important garage update. The floor is done! We finished coating the floor of the first bay, Zac installed the baseboard trim, and moved everything back against the walls. Here's an update pic of the garage before the motorcycle lift and all of the motorcycles moved back into the first bay (they were crammed into the 3rd bay while the work was going on). [ATTACH=CONFIG]6879[/ATTACH] My FFR build is taking place in the 2nd bay in the middle, where it's easy ...
Yesterday the first part of my Roadster arrived. I ordered the Moser 8.8" rear end because I'm going with the 3-link rear suspension. This ships from Moser Engineering in Indiana, so it arrived ahead of the kit. I was eagerly awaiting my first box, which was to arrive by freight between 3 PM and 6 PM. The sounds of school buses and garbage trucks were driving me crazy as I waited! Finally the doorbell rang and the freingh truck was out front with my crate on a pallet jack. The ...