-
25th Anniversary #9772
had a little bit of time last night to drill out the elephant ears for the vent tubes...
used a couple Spectre Performance 8791 3" ID 90 Degree Boots to angle the hoses up and away from the headers, these mate up with the blowers and the blast gates
went larger than the 3" hose to give a little wiggle room, used a 3 3/4 hole saw and fitted some trim protector around the hole openings to keep from cutting the hoses
looks much better now that these are tucked out of the way...
IMG_4372.jpg IMG_4373.jpg IMG_4374.jpg
drilled out one more hole in the dash for the light switch, only 2 more holes left for the dash - waiting on my grab handle to arrive...
still waiting on the ECU for the coyote, it's been since October!
Last edited by toadster; 04-18-2023 at 07:09 PM.
-
Post Thanks / Like - 0 Thanks, 2 Likes