Boig Motorsports

Visit our community sponsor

ej207 Engine Prep-n-Install

Getting the engine ready for the 818
  1. ARE Dry Sump SUBARU ej207 818JSR plumbing schematic  a
  2. SECO seals  1b
  3. Heat Exchangers chassis mount  1a
  4. Head Breather Junction  1a
  5. Scavange Vent Lines Mounted  1a
  6. 3D Printed Hose Clamps  1a
  7. Pump Lines  1a
  8. 818JSR Dry Sump Tank Installed  1a
  9. 818JSR Eng n Trans in position  1a
  10. 818JSR Trans to Eng  1a
  11. Trans and Eng Hoist  1a
  12. Head Vent  1a
  13. Cyl 4 Exhaust Valve  1a
  14. JDM ej207 Headers Heat Shield Comp a
  15. ej207 Oil Pump removed 11a
  16. Water Pump Comparison  1a
  17. ej207 Oil Cooler Return Port modified to plug  4a
  18. Cyl4 Coolant Mod  3a
  19. ej207 Alt Brkt Wire Brushed  1a
Showing photos 1 to 19 of 19

FFMetal

Visit our community sponsor