I detailed in Post #184 the blower install, and in Post #205 the blast gate install.
Since then, I moved the DS blast gate pull so that it hopefully won't interfere with the door check strap. I just moved it to the front face of the 2x2 frame tube and lowered it a bit.
Next, I went ahead and installed the 3" hoses onto the blowers and blast gates. Both are routed above the heat shields I installed above the headers, hopefully to help keep some of the heat off of the hoses. At the front it's just hanging until I'm ready to put the body on and terminate at the brake duct openings. On the DS, I may have to tweak this a little bit once I go to install the elephant ears. I'll definitely need to add a notch for the hose to pass through. With the hydroboost in the same space, its getting a little packed on this side.
I also found a good way to hold the heater bypass valve choke wire onto the valve stem. I used a 3mm starlock push-on washer. It grips really well and I ended up putting one above and below the choke coil. It worked really well to secure it.
![]()



Thanks:
Likes: 


Reply With Quote