DougB
08-31-2016, 11:36 AM
I had to take 18 months off, but now I'm back and building. To date, front suspension and IRS installed. Most panel have been drilled, many powder coated Silver Hammer Tone. Next is the hydro-electric steering, brake lines, and fuel lines. Coyote and TKO 600 are ordered. I'm excited to be back at it.