Visit our community sponsor
I moved on to the Passenger side footbox. located the top aligned and marked the attachment rails. Drilled and cleco'd them in place then slid in the inner wall to see how it would all align. As a first time builder I find it easier to get as many pieces together as possible and align them as well as possible before drilling and making it permanent. I did mention before the FF guys do a pretty good job on the alignment but when you have the time to make it better it can only pay off downstream.