Forte's

Visit our community sponsor

Photo 61 of 114 from 25th Anniversary MK4 "Quarter Past Half Time Machine" Build: NRG Removable Steering Wheel

20210317 - Preparing for holes 2 thru 6 to be drilled. 1st hole already drilled and tapped using the [T] on the left, but which is straight up normally our found in the 12 o'clock position.
*NOTE: The threads you see in the top are from the set screw that I drilled*

Photo Added
11-05-2021, 12:48 AM
Album
25th Anniversary MK4 "Quarter Past Half Time Machine" Build: NRG Removable Steering Wheel
Added by
ydousurf

FFMetal

Visit our community sponsor